2024 Bateman Demolition Contractor Grapple BDG70-2/3
- Year 2024
 - Make Bateman
 - Model Demolition Contractor Grapple
 
2024 Bateman Demolition Contractor Grapple BDG70-2/3
The BATEMAN Demolition Contractor is a reliable grapple for the demolition industry. Our in-house design team allows us to customize the BATEMAN Demolition Contractor to suit your application needs. Lugging is available for all material handler and excavator classes. The Demolition Contractor is available in a 2 over 3 tine standard configuration, or optional 3 over 4, or 4 over 5 tine configurations.
Features may include:- Heavy-duty AR400 steel structure with AR500 steel tips.
 
- Reinforced, heavy-duty box tine design for maximum strength.
 
- Longer tip design provides longer life and easy replacement.
 
Dimensions
							Dimensions
							Max Opening: 112 in (2,845 mm)
						
						
							Width
							52 in (1,321 mm)
						
						Weights
							Weight
							4,600 lb (2,087 kg)